Franco-Nevada Announces $500 Million Precious Metals Stream with Sibanye-Stillwater By Investing.com
(in
“We are excited to partner with Sibanye-Stillwater and gain exposure to production from this fully integrated, long life, platinum group metal (“PGM“) complex,” said
Transaction (JO:) Highlights:
- Immediate Precious Metals Growth: The Stream will deliver immediate cash flow from a diversified production base in
South Africa , a seasoned mining jurisdiction. The Stream is expected to generate a stable GEO profile over the next 20 years based off the platinum, palladium, rhodium and gold (“4E PGM“) production profile shown in the chart below. This profile is based on Sibanye-Stillwater’s board-approved ore reserve LOM as atDecember 31, 2023 for its existing operations and includes certain pre-feasibility and feasibility stage projects being studied, which leverage existing infrastructure (the “Replacement Projects“). The Stream GEO profile is comprised of approximately 70% gold and 30% platinum deliveries1 at consensus commodity prices with a 45+ year LOM. - Proven Operator and Significant Invested Capital in an
Integrated Complex : Sibanye-Stillwater’s Western Limb operations benefit from extensive existing infrastructure consolidated through the merger of three prior operators, which has unlocked numerous synergies. The complex is expected to operate at the lower half of the PGM cost curve2. These operations consist of the Marikana, Rustenburg, and Kroondal operations and a total of 13 underground mines. The mines are supported by Sibanye-Stillwater’s concentrators and smelter and refining complex. Sibanye-Stillwater is a leader in South African mine safety and has committed to continuous safety improvements. The operations have strong relationships with their Black Economic Empowerment (“BEE“) partners and local communities. - Long Reserve Lives with Extensive Resources: The Stream is referenced to production from the Stream Area, which extends over 500 km2 of Sibanye-Stillwater’s Western Limb operations in
South Africa . The Stream Area assets have a mine life up to 2070 including ore Reserves and Replacement Projects, based on current projections. Sibanye-Stillwater has the potential to sustain higher production levels for longer, with 4E PGM Measured and Indicated (“M&I“) Resources of 182 Moz inclusive of the 34 Moz of 4E PGM Reserves3, providing extensive long-term optionality. - Operations Benefit from a Unique and Diversified Basket of Metals: Sibanye-Stillwater’s Western Limb operations currently produce approximately 15% of the world’s platinum supply4. In addition, they produce palladium, rhodium and gold as primary 4E PGM components and a significant amount of chrome and other by-products, including approximately 28% of current global iridium and ruthenium supply4. The latter are both important to data storage and chip manufacturing and with platinum to a potential future hydrogen economy. By-products provide a more diversified basket price to the operations compared to many other global PGM producers. By-products contributed approximately 18% of Sibanye-Stillwater’s SA PGM revenue basket in H1 2024 with potential to expand this component of the business.
- Gold Deliveries linked to PGM Production: For approximately the first 25 years5, gold deliveries are linked to the volume of 4E PGM ounces produced. This reference to the overall production of these key metals helps ensure that gold deliveries are aligned with Sibanye-Stillwater’s PGM production, mitigating variations in gold grade between deposits.
Key Transaction Terms:
Gold Stream Parameters
- Stream deliveries to FNB are based on production from the Steam Area, according to the following schedule:
- Gold ounces equal to 1.1% of 4E PGM ounces contained in concentrate until delivery of 87.5 koz of gold, then
- Gold ounces equal to 0.75% of 4E PGM ounces contained in concentrate until total delivery of 237 koz of gold, then
- 80% of gold contained in concentrate for the remaining LOM.
Platinum Stream Parameters
- Stream deliveries to FNB are based on platinum production from the Stream Area, according to the following schedule:
- 1.0% of platinum contained in concentrate until the delivery of 48 koz of platinum, then
- Step-up to 2.1% of platinum contained in concentrate until total delivery of 294 koz of platinum, then
- No further platinum deliveries.
Additional Considerations
- Effective start date of the Stream is
September 1, 2024 with funding of the$500 million deposit anticipated in the next few weeks and first delivery approximately 45 days after closing of the transaction - Gold and platinum ounces delivered will be subject to an ongoing payment of 5% of spot prices respectively to Sibanye-Stillwater. In the case of gold, the ongoing payment will increase to 10% following completion of the 4E PGM link (after the delivery of 237 koz of gold to FNB)6
- Deliveries will be based on production from the mining operations from the Stream Area and exclude surface tailings retreatment, except in certain circumstances
- Corporate guarantees will be provided to FNB by Sibanye-Stillwater and the Marikana, Rustenburg and Kroondal operations’ operating companies, amongst others
- FNB will maintain a right of first refusal on future streams and royalties related to the Stream Area
- The transaction is subject to customary closing conditions, including the approval from the South African Reserve Bank
Medium-Term Production Profile
Figure 1.: Sibanye-Stillwater’s Western Limb Production (Metal in Concentrate) details a 20-year production profile from Sibanye-Stillwater’s Western Limb PGM operations based on reserve LOM declared at the end of 2023 and in addition, includes the Replacement Projects (including the Kroondal depth extension projects, E3, E4, and Saffy projects)7. Sibanye-Stillwater’s total reserve LOM plan based on 34 Moz of 4E PGM Mineral Reserves (100% basis) extends production beyond this period to 2070 at a reduced rate due to its long life K4 project at the Marikana operation.
Sibanye-Stillwater’s Western Limb Production (Metal in Concentrate)
Source: Sibanye-Stillwater |
Franco-Nevada and Sibanye-Stillwater have agreed to convert the 5% net profit interest that Franco-Nevada holds on the Pandora property to a 1% net smelter return royalty. Sibanye-Stillwater’s Pandora property forms a portion of its Marikana operations and includes the currently operating E3 decline. Three of the Replacement Projects being studied fall on a portion of the Pandora royalty ground.
Financing the Transactions
Franco-Nevada intends to finance the Stream from cash on hand, with approximately
Franco-Nevada Corporate Summary
Franco-Nevada Corporation is the leading gold-focused royalty and streaming company with the most diversified portfolio of cash-flow producing assets. Its business model provides investors with gold price and exploration optionality while limiting exposure to cost inflation. Franco-Nevada is debt-free and uses its free cash flow to expand its portfolio and pay dividends. It trades under the symbol FNV on both the
About Sibanye-Stillwater
Sibanye-Stillwater is a multinational mining and metals processing group with a diverse portfolio of operations, projects and investments across five continents. The Group is also one of the foremost global recyclers of PGM autocatalysts and has interests in leading mine tailings retreatment operations.
Sibanye-Stillwater is one of the world’s largest primary producers of platinum, palladium, and rhodium and is a top tier gold producer. It also produces and refines iridium, ruthenium, nickel, chrome, and cobalt. The Group has recently begun to diversify its asset portfolio into battery metals mining and processing and increase its presence in the circular economy by growing its recycling and tailings reprocessing exposure globally. For more information refer to www.sibanyestillwater.com.
Sibanye-Stillwater Mineral Resources and Mineral Reserves
Sibanye-Stillwater’s Mineral Resources and Mineral Reserves are estimates at a particular date (as at
Additional Information
Information relating to the Sibanye-Stillwater PGM assets contained in this news release has been provided by Sibanye-Stillwater.
Scientific and technical information included in this news release has been reviewed by
Forward-Looking Statements
This press release contains “forward-looking information” and “forward-looking statements” within the meaning of applicable Canadian securities laws and the United States Private Securities Litigation Reform Act of 1995, respectively, which may include, but are not limited to, statements with respect to future events or future performance, including the expected timing of closing the transaction, the expected future performance of Sibanye-Stillwater’s South African PGM assets and the Stream, and production and mine life estimates relating to Sibanye-Stillwater’s South African PGM assets. In addition, statements relating to reserves and resources, gold equivalent ounces (“GEOs”) and mine life are forward-looking statements, as they involve implied assessment, based on certain estimates and assumptions, and no assurance can be given that the estimates and assumptions are accurate and that such reserves and resources, GEOs or mine life will be realized. Such forward-looking statements reflect management’s current beliefs and are based on information currently available to management. Often, but not always, forward-looking statements can be identified by the use of words such as “plans”, “expects”, “is expected”, “budgets”, “potential for”, “scheduled”, “estimates”, “forecasts”, “predicts”, “projects”, “intends”, “targets”, “aims”, “anticipates” or “believes” or variations (including negative variations) of such words and phrases or may be identified by statements to the effect that certain actions “may”, “could”, “should”, “would”, “might” or “will” be taken, occur or be achieved. Forward-looking statements involve known and unknown risks, uncertainties and other factors, which may cause the actual results, performance or achievements of Franco-Nevada to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements. A number of factors could cause actual events or results to differ materially from any forward-looking statement, including, without limitation: fluctuations in the prices of the primary commodities that drive royalty and stream revenue (gold, platinum group metals, copper, nickel, uranium, silver, iron ore and oil and gas); fluctuations in the value of the Canadian and Australian dollar, Mexican peso, and any other currency in which revenue is generated, relative to the
For additional information with respect to risks, uncertainties and assumptions, please refer to Franco-Nevada‘s most recent Annual Information Form filed with the Canadian securities regulatory authorities on www.sedar.com and Franco-Nevada‘s most recent Annual Report filed on Form 40-F filed with the SEC on www.sec.gov
__________ |
|
1 Assuming current projections of 4E PGM production based on Reserves and Replacement Projects at consensus commodity prices |
|
2 Combined costs (excluding by-products) following the Marikana K4 mine ramp-up |
|
3 Attributable M&I Resource of 1.0 Bt at 4.3 g/t 4E PGM grade for 142 Moz 4E PGM (182 Moz 4E PGM on a 100% basis) and attributable Inferred Resources of 227.5 Mt at 4.6 g/t 4E PGM grade for 33.7 Moz 4E PGM (41.7 Moz on a 100% basis) as at |
|
4 Based on 2023 production per Sibanye-Stillwater’s public disclosure and total 2023 supply per Johnson Matthey (LON:) PGM market report ( |
|
5 Assuming current projections of 4E PGM production based on Reserves and Replacement Projects currently being studied by Sibanye-Stillwater |
|
6 The ongoing payments are subject to reduction in certain circumstances |
|
7 The development and timing of these replacement projects is subject to achieving positive commercial and economic outcomes from the feasibility studies underway. |
https://i-invdn-com.investing.com/redesign/images/seo/investing_300X300.png
2024-12-19 05:32:04